PROJECT MANAGEMENT

The identification of fire safety upgrading or enhancement, following a fire safety audit/ risk assessment of your premises, often leads to some work being required to meet the identified risks. The works may range across several areas of specialism and include mechanical, electrical and passive building works.

LWF are able to undertake on your behalf:

  • Co-ordination of all project design input.
  • Preparation of a project execution plan.
  • Assistance with the procurement and selection of contractors.
  • Definition of contractual relationships.
  • Quantity surveying services in association with contract tender and award.
  • Preparation and co-ordination of all pre and post tender documentation. Organisation and evaluation of contract tenders.
  • Site supervision of the project.
  • Contract valuations and administration.
  • Post contract services.

PROJECT COST PREPARATION

The design and specification of works normally has a cost implication therefore before works commence you need to know the risk, priority and cost of the recommendations before decisions can be made on implementation.

LWF are able to undertake on your behalf:

  • Preparation of first order and budget costing for the implementation of works, following the designs and specifications undertaken by LWF or other consultants.
  • Preparation of pre-tender budgets.
  • Preparation of a prioritised action plan.
  • Preparation of a co-ordinated works programme.
  • Full cost and evaluation services in line with the contract management service described above.
  • CAD drawings.
To talk to us about your project, please contact us by calling 020 8668 8663.


Our Services


To discuss any of our services please call 020 8668 8663 or email fire@lwf.co.uk

Subscribe to our fire safety blogs

Bulletins
Email Format
* indicates required

FIRE SAFETY BLOGS

  • Fire Engineering Design and Risk Assessment - Firefighting & External Water Supplies - Part 27

    In LWF’s Fire Engineering blog series for Architects and others in the building design business, we have been looking at fire safety engineering. In part 26, we looked at how the choice of fire hydrant can affect the efficiency of delivery and by working out the additional time required to prime an underground hydrant when compared to a pillar hydrant with instantaneous couplings, it was established there could be as much as 2 minutes delay...

    Read more...

  • Fire Safety for Healthcare Premises - Venting of Basements - Part 61

    In LWFs blog series for healthcare professionals, the aim is to give information on best practice of fire safety in hospitals and other healthcare premises. In part 60 of this series, the placement of fire hydrants in relation to hospital buildings was discussed. In part 61, we will look at the effects of smoke on basement levels and the use of venting.A fire which starts in a basement or involves a basement level causes...

    Read more...

  • Facilities Management & Fire Safety - Insurers & Property Protection - Part 8

    In LWF’s blog series for those who work in Facilities Management or who have an interest in or responsibility for fire safety, we have been looking at the part Insurers have played in property protection over the years. In part 7, we discussed the role the FOC played in producing rules and regulations not only for building standards but also for fire protection products. In part 8, we will continue looking at the impact of...

    Read more...

  • Fire Engineering Design and Risk Assessment - Firefighting & External Water Supplies - Part 26

    In LWF’s fire engineering blog series for Architects and other interested parties in the building design business, we have been looking at firefighting. In part 25, we looked at how hydrants should be located in relation to the building perimeter and the likely position of a Fire Service pump upon attending a fire at the premises. In part 26, we continue looking at location and also the type of hydrant provided in relation to the...

    Read more...

  • Fire Safety for Healthcare Premises - Fire Mains - Part 60

    In LWFs blog series for healthcare professionals, the aim is to give information on best practice of fire safety in hospitals and other healthcare premises. In part 59 of this series, LWF discussed the requirements for healthcare buildings with a hospital street and which do not require a fire-fighting shaft. In part 60, we will look at the provision of fire mains.Fire mains must be provided in every firefighting shaft, or in some instances,...

    Read more...

Case Studies

The Wohl Neuroscience Institute - Fire Safety, Strategy & Engineering
Key Facts: Client: King’s Clinical Neuroscience Institute Project Manager: MACE Ltd Designers: Devereux Architects/Allies and Morrison Approximate Size: 7,400m2 Description of the Project:...

Read more..

General Bulletins

Fire - The External Risk
When we consider fire safety, our focus is normally from within, what can we do to prevent the occurrence of fire and how we can limit its damage.  Whilst this is the correct stance to take, we m...

Read more..

Technical Bulletins

Evacuation Modelling - Factor in Human Behaviour
Evacuation of buildings can be analyzed in different ways. Approved Document B (ADB) which provides guidance on meeting the requirements of the England and Wales Building Regulations with regard to fi...

Read more..

Site map | Web development London