Fire Engineering Design and Risk Assessment - Firefighting & Rising Water Mains - Part 36

Posted by LWF: 15/04/2019 15:15

In LWF’s fire engineering blog series for Architects and others in the building design business, we have been talking about firefighting and rising water mains in buildings. In part 35, we began to discuss wet rising water mains and in part 36 we will continue looking at that subject before considering horizontal mains, also known as internal hydrants, which are seen more commonly in buildings with large floor area.

It was established in part 35 that the supply of water to wet risers should be sufficient to service three landing valves in operation at the same time – including the three most unfavourable hydraulic locations. This requires a minimum flow rate of 1500 litres/minute.

The provision of a 45000-litre water storage tank is the minimum required, provided it is fitted with an automatic water company infill connection which is capable of replenishing the tank with 500 litres/minute reliably. This would mean that the combination of the storage tank and infill could provide a water provision of 1500 litres/minute for 45 minutes.

The system requires back-up systems in case of failure at a critical time. Duplicate automatic pumps should be provided, one of which is a standby. Each pump should be powered by different independent power sources and should automatically become operational when a drop in pressure or water flow is detected. Both audio and visual alarms should be provided to alert to the situation when this occurs.

The system should also be provided with an emergency tank filling connection for any situation where the automatic infill is not operational. The provision of a breeching inlet and 100 mm pipe which discharges into the wet riser storage tank is sufficient.

The breeching inlets and tank filling connections for wet rising water mains should be consistent with the standards required for dry risers.

Horizontal mains/internal hydrants


Horizontal mains work on the same basic principle as rising mains, but are designed to cover a large horizontal area, rather than a tall vertical one. Such systems can be wet or dry and are subject to the same requirements and standards as rising mains. They are most commonly seen in large shopping centres or complexes but are suitable for any large building.

In part 36, LWF look at how placement of internal mains and landing valves should be considered and decided upon. In the meantime, if you have any questions about this blog, or wish to discuss your own project with one of our fire engineers, please contact us. 

Lawrence Webster Forrest has been working with their clients for over 25 years to produce innovative and exciting building projects. If you would like further information on how LWF and fire strategies could assist you, please contact Peter Gyere on 020 8668 8663.

While care has been taken to ensure that information contained in LWF's publications is true and correct at the time of publication, changes in circumstances after the time of publication may impact on the accuracy of this information.

Leave a reply

  *

  *

 


CAPTCHA Image

[ Change the image ]


*Required

Subscribe to our fire safety blogs

Bulletins
Email Format
* indicates required

FIRE SAFETY BLOGS

  • Fire Safety for Healthcare Premises - Fire Safety Training for Staff - Part 80

    In LWFs blog series for healthcare professionals, the aim is to give information on best practice of fire safety in hospitals and other healthcare premises. In part 79, LWF began to discuss fire safety training for staff in healthcare premises and in part 80, we continue from that point with more information on who should attend training and what it should comprise.Fire safety training for staff should have the aim of producing awareness and...

    Read more...

  • Facilities Management & Fire Safety - Community Fire Safety - Part 6

    In LWF’s blog series for those who work in Facilities Management, or who have an interest in or responsibility for fire safety, we have been looking at community fire safety. In part 5, we looked at how government initiatives and programmes have impacted fire safety in homes and schools, including the home fire risk checks undertaken by the Fire Service.  In part 6, we will continue discussing community fire safety by looking at some of...

    Read more...

  • Fire Engineering Design and Risk Assessment - Firefighting Shafts - Part 46

    In LWF’s recent Fire Engineering blog series for Architects and others in the building design industry, we have been looking at Firefighting. In part 45, we looked at recommendations for the provision of firefighting shafts contained in Approved Document B and BS 9999. In part 46, we consider what those documents have to say on general design considerations for firefighting shafts.Approved Document B and BS...

    Read more...

  • Fire Safety for Healthcare Premises - Fire Safety Training for Staff - Part 79

    In LWFs blog series for healthcare professionals, the aim is to give information on best practice of fire safety in hospitals and other healthcare premises. In part 78, LWF looked at fire precautions in underground locations. In part 79, we discuss fire safety training for staff in healthcare premises.  The effective management of fire safety training for all staff in healthcare venues is an important area of fire safety management. It is also a statutory...

    Read more...

  • Facilities Management & Fire Safety - Community Fire Safety - Part 5

    In LWF’s blog series for those who work in Facilities Management, or who have an interest in or responsibility for fire safety we have been looking at domestic fire safety and the related initiatives in the UK. In part 4, we discussed how useful fire safety education for children has been in influencing fire-safe behaviour in the home. In part 5, we consider home fire risk checks before looking at the evidence of successful community...

    Read more...

Case Studies

Brentwood Town Hall Redevelopment
The redevelopment of Brentwood Town Hall included renovating the existing five storey property to provide police and council offices, a community hub and lettable office space across the basement, gro...

Read more..

General Bulletins

Fire - The External Risk
When we consider fire safety, our focus is normally from within, what can we do to prevent the occurrence of fire and how we can limit its damage.  Whilst this is the correct stance to take, we m...

Read more..

Technical Bulletins

Evacuation Modelling - Factor in Human Behaviour
Evacuation of buildings can be analyzed in different ways. Approved Document B (ADB) which provides guidance on meeting the requirements of the England and Wales Building Regulations with regard to fi...

Read more..

Site map | Web development Croydon