Posted by LWF: 09/04/2019 11:50

In LWF’s Fire Engineering blog series for Architects and others in the building design business, we have been looking at those provisions which can be made to assist firefighting in case of a fire. In part 34, we commenced looking at wet rising mains and noted that while they can be permanently connected to water mains, it is more common to see the systems connected to a water tank with a pump or gravity feed, or both. In part 36, we will continue discussing wet rising mains.

While wet rising mains are suitable for builds of all heights, they are most necessary in buildings where the highest floor is more than 50 metres above fire service access level. If a dry rising main system were used in a very tall building, the water pressure necessary and the time taken to pump water to the highest level would be prohibitive. 

As sufficient pressure is required in the upper levels of a wet riser system, it can mean that excessive pressure is present in the lower portion. In order to avoid the potential for overly high pressure in firefighting hoses used in the lower levels, it can be necessary to limit the delivery pressure. The running pressure from each landing valve should be between 4 and 5 bar when in use. The hose pressure, when the nozzle is in the off position, should be no more than 7 bar.

The method for controlling pressure is the inclusion of a pressure relief connection, built into the delivery side of the landing valve which is permanently connected to a waste pipe. Ideal pressure is achieved by calibrating each pressure relief connector at each landing valve location, allowing for the pressure differential to be adjusted to suit.

An alternative to pressure relief connections is to use a dead shut-off pressure reducing valve which doe not require a drain connection.

As fires can be approached by the Fire Service in a three-pronged attack – from below, from above and on the floor of fire origin, it is necessary that any wet rising main is capable of delivering sufficient water to the landing valve locations of any three consecutive floors of the building simultaneously. This means that the water supply to the system must be sufficient and reliable. In practical terms, the system will require 1500 litres/minute with a minimum running pressure of 4 bar at the highest possible landing valve.

In part 36, LWF will continue to look at the provision of sufficient water to wet riser systems. In the meantime, if you have any questions about this blog, or wish to discuss your own project with one of our fire engineers, please contact us. 

Lawrence Webster Forrest has been working with their clients for over 25 years to produce innovative and exciting building projects. If you would like further information on how LWF and fire strategies could assist you, please contact Peter Gyere on 0800 410 1130.

While care has been taken to ensure that information contained in LWF's publications is true and correct at the time of publication, changes in circumstances after the time of publication may impact on the accuracy of this information.

Leave a reply

  *

  *

 


CAPTCHA Image

[ Change the image ]


*Required

Subscribe to our fire safety blogs

Bulletins
Email Format
* indicates required

FIRE SAFETY BLOGS

  • Fire Safety for Healthcare Premises - Fire Safety Training for Staff - Part 80

    In LWFs blog series for healthcare professionals, the aim is to give information on best practice of fire safety in hospitals and other healthcare premises. In part 79, LWF began to discuss fire safety training for staff in healthcare premises and in part 80, we continue from that point with more information on who should attend training and what it should comprise.Fire safety training for staff should have the aim of producing awareness and...

    Read more...

  • Facilities Management & Fire Safety - Community Fire Safety - Part 6

    In LWF’s blog series for those who work in Facilities Management, or who have an interest in or responsibility for fire safety, we have been looking at community fire safety. In part 5, we looked at how government initiatives and programmes have impacted fire safety in homes and schools, including the home fire risk checks undertaken by the Fire Service.  In part 6, we will continue discussing community fire safety by looking at some of...

    Read more...

  • Fire Engineering Design and Risk Assessment - Firefighting Shafts - Part 46

    In LWF’s recent Fire Engineering blog series for Architects and others in the building design industry, we have been looking at Firefighting. In part 45, we looked at recommendations for the provision of firefighting shafts contained in Approved Document B and BS 9999. In part 46, we consider what those documents have to say on general design considerations for firefighting shafts.Approved Document B and BS...

    Read more...

  • Fire Safety for Healthcare Premises - Fire Safety Training for Staff - Part 79

    In LWFs blog series for healthcare professionals, the aim is to give information on best practice of fire safety in hospitals and other healthcare premises. In part 78, LWF looked at fire precautions in underground locations. In part 79, we discuss fire safety training for staff in healthcare premises.  The effective management of fire safety training for all staff in healthcare venues is an important area of fire safety management. It is also a statutory...

    Read more...

  • Facilities Management & Fire Safety - Community Fire Safety - Part 5

    In LWF’s blog series for those who work in Facilities Management, or who have an interest in or responsibility for fire safety we have been looking at domestic fire safety and the related initiatives in the UK. In part 4, we discussed how useful fire safety education for children has been in influencing fire-safe behaviour in the home. In part 5, we consider home fire risk checks before looking at the evidence of successful community...

    Read more...

Case Studies

Brentwood Town Hall Redevelopment
The redevelopment of Brentwood Town Hall included renovating the existing five storey property to provide police and council offices, a community hub and lettable office space across the basement, gro...

Read more..

General Bulletins

Fire - The External Risk
When we consider fire safety, our focus is normally from within, what can we do to prevent the occurrence of fire and how we can limit its damage.  Whilst this is the correct stance to take, we m...

Read more..

Technical Bulletins

Evacuation Modelling - Factor in Human Behaviour
Evacuation of buildings can be analyzed in different ways. Approved Document B (ADB) which provides guidance on meeting the requirements of the England and Wales Building Regulations with regard to fi...

Read more..