Lawrence Webster Forrest (LWF), Fire Engineering and Fire Risk Management Consultants
Lawrence Webster Forrest (LWF), Fire Engineering and Fire Risk Management Consultants



Navigation

Client login
Forgotten password
Follow us on Twitter Follow us on Facebook Subscribe to our blog

Lawrence Webster Forrest
Legion House
Lower Road
Kenley
Surrey
CR8 5NH

Tel: +44 (0)20 8668 8663 Fax: +44 (0)20 8668 8583
E-mail: fire@lwf.co.uk

Fire Engineering Design and Risk Assessment - Firefighting - Part 13

Posted by LWF: 08/11/2018 11:24

In LWF’s fire engineering blog series for architects and others in the building design business, we began discussing firefighting. In part 12, an overview of the term and its meaning before looking at the method of firefighting, namely the strategy, tactics and operations of the Fire Service in the UK and equivalent organisations in other parts of the world. In part 13, we look at firefighting by occupiers of a building.

Firefighting undertaken by occupiers of a building is sometimes referred to as ‘first-aid firefighting’, meaning that it is attempted by persons on the scene at the time of the fire, while support from a Fire Service is obtained. The aim of first-aid firefighting is usually to extinguish a fire as quickly as possible, before it becomes larger and more intense. The ability of staff members and building occupants to extinguish a fire will be based on various factors, such as the availability of equipment, understanding of fire extinguishing through training, physical ability and skill level. 

The duty of the ‘responsible person’ or of a business or organisation is to ‘safeguard the safety of relevant persons’ and so it may be that a building which is able to comply with all relevant fire safety standards relating to evacuating the building – automatic fire detection, warning systems, emergency lighting etc. – that fire extinguishers will not be provided, as they would be considered unnecessary in terms of the main safeguarding duty. 

However, it is usual for fire extinguishers to be provided and when they are, the extinguishers provided must be in accordance with the rules and codes relating to fire extinguishers in the country or region in question. Adequate training must be given to all employees in the use of fire extinguishers in a fire situation and should include how to operate the types of extinguisher provided as well as taking into account the physical abilities of the staff to carry and operate the tanks over the distances which may be required. 

It is necessary in all circumstances that a route to safety is maintained, so that the operator of the fire extinguisher can make an escape at any point they deem necessary. Training should include guidance on the possible sizes of a fire and should inform the size above which it is necessary to simply evacuate rather than attempting firefighting procedures. All firefighting, extinguisher and general fire safety training should be repeated at least once a year.

In part 14 of this series, LWF will look at hose reels. In the meantime, if you have any questions about this blog, or wish to discuss your own project with one of our fire engineers, please contact us.

Lawrence Webster Forrest has been working with their clients for over 25 years to produce innovative and exciting building projects. If you would like further information on how LWF and fire strategies could assist you, please contact Peter Gyere on 020 8668 8663.

While care has been taken to ensure that information contained in LWF's publications is true and correct at the time of publication, changes in circumstances after the time of publication may impact on the accuracy of this information.

Leave a reply

  *

  *

 


CAPTCHA Image

[ Change the image ]


*Required

Subscribe to our fire safety blogs

Bulletins
Email Format
* indicates required

FIRE SAFETY BLOGS

  • Fire Engineering Design and Risk Assessment - Firefighting - Part 14

    In LWFs fire safety engineering blog series for Architects and others in the building design business, we have begun to look at firefighting. In part 13, we began to look at how firefighting can be undertaken by the occupiers of a building if a fire starts. The use of portable fire extinguishers was discussed along with relevant training was discussed. In part 14, the provision of hose reels and the standards involved will be covered.

    Read more...

  • Fire Safety for Healthcare Premises - External Fire Spread - Part 48

    In LWF’s blog series for healthcare professionals, the aim is to give information on best practice of fire safety in hospitals and other healthcare premises. In part 47 of this series, LWF took a look at the use of sprinkler protection in healthcare venues and in part 48, we begin to discuss the potential for external fire spread and what precautions should be taken to avoid it.It should be borne in mind that we...

    Read more...

  • Facilities Management & Fire Safety - Fire Safety Engineering & the Prescriptive Approach - Part 5

    In LWFs blog series for those who work in facilities management or who have an interest in or responsibility for fire safety, we have been looking at the term ‘Fire Safety Engineering’ and what it involves. In part 4 of the series, we began to look at the differences between fire prevention and safety based on prescriptive codes and fire safety engineering. In part 5, we will continue from that point by looking at the...

    Read more...

  • Fire Engineering Design and Risk Assessment - Firefighting - Part 13

    In LWF’s fire engineering blog series for architects and others in the building design business, we began discussing firefighting. In part 12, an overview of the term and its meaning before looking at the method of firefighting, namely the strategy, tactics and operations of the Fire Service in the UK and equivalent organisations in other parts of the world. In part 13, we look at firefighting by occupiers of a building.Firefighting undertaken by occupiers...

    Read more...

  • Fire Safety for Healthcare Premises - Sprinklers - Part 47

    In LWF’s blog series for healthcare professionals, the aim is to give information on best practice of fire safety in hospitals and other healthcare premises. In part 46 of this series, we looked at the tank arrangement for sprinkler systems and how each pump should be arranged to draw water from either tank, so that any one tank or pump can be isolated. In part 47, we continue from that point on the subject of...

    Read more...

Case Studies

The Wohl Neuroscience Institute - Fire Safety, Strategy & Engineering
Key Facts: Client: King’s Clinical Neuroscience Institute Project Manager: MACE Ltd Designers: Devereux Architects/Allies and Morrison Approximate Size: 7,400m2 Description of the Project:...

Read more..

General Bulletins

Fire - The External Risk
When we consider fire safety, our focus is normally from within, what can we do to prevent the occurrence of fire and how we can limit its damage.  Whilst this is the correct stance to take, we m...

Read more..

Technical Bulletins

Evacuation Modelling - Factor in Human Behaviour
Evacuation of buildings can be analyzed in different ways. Approved Document B (ADB) which provides guidance on meeting the requirements of the England and Wales Building Regulations with regard to fi...

Read more..

Site map | Web development London