Lawrence Webster Forrest (LWF), Fire Engineering and Fire Risk Management Consultants
Lawrence Webster Forrest (LWF), Fire Engineering and Fire Risk Management Consultants



Navigation

Client login
Forgotten password
Follow us on Twitter Follow us on Facebook Subscribe to our blog

Lawrence Webster Forrest
Legion House
Lower Road
Kenley
Surrey
CR8 5NH

Tel: +44 (0)20 8668 8663 Fax: +44 (0)20 8668 8583
E-mail: fire@lwf.co.uk

Facilities Management & Fire Safety - Inspection, Testing and Maintenance - Part 3

Posted by LWF: 06/06/2018 12:29

In LWF’s blog series for people who work in Facilities Management, or anyone with an interest in or responsibility for fire safety, we have been looking at the types of inspection, testing and maintenance which must be undertaken to achieve the required standards of fire safety management in an organisation. In part 2, the references and sources which should be taken into consideration when composing the itinerary of checks and tests were outlined, in addition to discussing those relatively simple daily tasks which must be completed. In part 3, we continue from that point to discuss weekly, monthly and quarterly task lists.

On a weekly basis, the following tasks must be completed:

- Checks to escape routes and final exit doors to ensure they are clear of debris, stored items and are fully accessible in case of fire. General housekeeping must also be checked to ensure no fire hazards are developing through an inappropriate storage of goods or rubbish.
- The fire alarm system should be tested as per the manufacturer/installer’s instructions to ensure it continues to function efficiently.
- All door release mechanisms should be checked for correct functionality.
- Sprinkler installations must be inspected, along with any other fire-fighting systems and should be tested.
- Operate the smoke-control systems in place to support safe evacuation from the premises.
- Test the switches provided for both evacuation and fire-fighting lifts.

On a monthly basis, the following must be undertaken:

- Emergency escape lighting should be fully tested, including any battery or generator back-up.
- The visibility and placement of fire safety signs must be checked.
- All provided fire extinguishers must be in place and undamaged, they must be accessible at all times.
- Hose reels should also be checked for damage and still be in place and accessible.
- Generators, vented batteries and any other system to provide back-up power for fire alarm systems should be checked.
- A simulation of loss of main power supply to the evacuation and fire-fighting lifts should be undertaken.

On a quarterly basis, the following checks should be made:

- The sprinkler systems must undergo maintenance to the standard indicated by installer/manufacturer and to align with all relevant guidance.
- All smoke-control systems, including those which are for use by the Fire Service, must be tested and found to work correctly.

In part 4 of this series, LWF will continue the subject of checks, tests and maintenance of fire safety and fire prevention equipment by looking at those checks which must be made on a bi-annual and annual basis. In the meantime, if you have any queries about your own facilities or wish to discuss this blog series, please contact Peter Gyere in the first instance on 0208 668 8663.

Lawrence Webster Forrest is a fire engineering consultancy based in Surrey with over 25 years' experience, which provides a wide range of consultancy services to professionals involved in the design, development and construction and operation of buildings. 

While care has been taken to ensure that information contained in LWF's publications is true and correct at the time of publication, changes in circumstances after the time of publication may impact on the accuracy of this information.

Leave a reply

  *

  *

 


CAPTCHA Image

[ Change the image ]


*Required

Subscribe to our fire safety blogs

Bulletins
Email Format
* indicates required

FIRE SAFETY BLOGS

  • Fire Engineering Design and Risk Assessment - Foam System Discharge Devices continued - Part 7

    In LWF’s fire engineering blog series for architects and others in the building design industry, we have been discussing methods of fire suppression. In part 6, some of the types of foam system discharge devices were outlined and in part 7, that is continued before moving on to look at Foam system designs.A foam inlet system involves a breeching on the outside of a building being used by the Fire Service to pump foam...

    Read more...

  • Fire Safety for Healthcare Premises - Intensive Care Protection - Part 26

    In LWF’s blog series for healthcare professionals, we look to give information on best practice in fire safety for hospitals and other healthcare premises. In part 25, the use of external escape routes was raised and an outline given of how to give a safe and viable outside route to an external assembly point.  In part 26, LWF looks at the protection of those patients in Intensive Care wards in case of fire.The avoidance...

    Read more...

  • Facilities Management & Fire Safety - Inspection, Testing and Maintenance - Part 4

    In LWF’s blog series for people who work in Facilities Management or those with an interest in or responsibility for fire safety, we have been looking at the inspection, testing and maintenance regimen required in an organisation and how it should be carried out by the responsible person or relevant sub-contractor or in-house qualified personnel. In part 3, the checks that must be carried out on a daily, weekly, monthly and quarterly basis were outlined....

    Read more...

  • Fire Safety for Healthcare Premises - External Escape Routes - Part 25

    In LWF’s blog series for healthcare professionals, the aim is to give information on best practice of fire safety in hospitals and other healthcare premises. In part 24 of this series, the fire safety requirements for final exits was outlined and in part 25, we look at external escape routes.While the escape routes from any point inside a building to the outside are extremely important, it is also important to look at the route...

    Read more...

  • Fire Engineering Design and Risk Assessment - Foam System Discharge Devices - Part 6

    In LWF’s fire engineering blog series for Architects and others in the building design business, we have been looking at methods of fire suppression. In part 5, the different types of foam system were outlined and in part 6, we take a look at what is available in terms of foam system discharge devices.Foam ChambersUsed as a part of cone roof storage tanks, a foam chamber contains a vapour seal, the role of...

    Read more...

Case Studies

The Wohl Neuroscience Institute - Fire Safety, Strategy & Engineering
Key Facts: Client: King’s Clinical Neuroscience Institute Project Manager: MACE Ltd Designers: Devereux Architects/Allies and Morrison Approximate Size: 7,400m2 Description of the Project:...

Read more..

General Bulletins

Fire - The External Risk
When we consider fire safety, our focus is normally from within, what can we do to prevent the occurrence of fire and how we can limit its damage.  Whilst this is the correct stance to take, we m...

Read more..

Technical Bulletins

Evacuation Modelling - Factor in Human Behaviour
Evacuation of buildings can be analyzed in different ways. Approved Document B (ADB) which provides guidance on meeting the requirements of the England and Wales Building Regulations with regard to fi...

Read more..

Site map | Web development London