Facilities Management & Fire Safety - Fire & Rescue Service Facilities - Part 8

Posted by LWF: 11/01/2018 14:13

In LWF’s blog series for those who work in Facilities Management or who have an interest in or responsibility for Fire Safety, we have been looking at the facilities which must be provided to the Fire Service, whether structural or in terms of information. In Part 7, smoke control was discussed in terms of initial design and control in case of a fire. In Part 8, we look at what will be needed when the Fire Service arrive at the premises to deal with a fire.

Particularly in the case of large and complex buildings and sites, it is important to prepare a pack for the Fire Service with information on the site. A suitably labelled container should be kept at or near the entrance to the building so that it is accessible to the relevant person who will meet with the Fire Service upon arrival. The information pack should contain all relevant information and plans of each floor, including basements if appropriate; any hazardous materials stored on site; service control locations, sprinkler stop valves and any other information which might be used at the time of a fire.

In addition to the pack, it can be useful for basement plans to be displayed in the building, as well as signs to indicate the whereabouts of potentially hazardous materials. Depending upon the type of hazard, this signage may be legally required in any case.

Communications between Fire Service personnel are of the utmost importance, particularly in large and complex buildings in which their own portable radios may prove unreliable. It is important in such cases that consideration is given to a dedicated communications system for use by the Fire Service in a fire situation. Such systems may involve the placement of dedicated telephones in fire-fighting lobbies as well as a control point at access level. 

BS 5839-9:2011 - Fire detection and fire alarm systems for buildings. Code of practice for the design, installation, commissioning and maintenance of emergency voice communication systems provides the recommendations that should be complied with for the installation of two-way speech communication systems set up for use by the Fire Service. 

As such communication systems are specifically made for use during a fire situation, it is important that they are installed using cables with enhanced fire resistance, to avoid failure when it is most required. BS 8434-2:2003+A2:2009 provides the necessary requirements for that level of fire resistance.

LWF’s next blog for Facilities Management will be ‘Fire and Human Behaviour – Part 1’ as we begin to look at that most unpredictable of variables – people. In the meantime, if you have any queries about your own facilities or wish to discuss this blog series, please contact Peter Gyere in the first instance on 0208 668 8663.

Lawrence Webster Forrest is a fire engineering consultancy based in Surrey with over 25 years' experience, which provides a wide range of consultancy services to professionals involved in the design, development and construction and operation of buildings. 

While care has been taken to ensure that information contained in LWF's publications is true and correct at the time of publication, changes in circumstances after the time of publication may impact on the accuracy of this information.

Leave a reply

  *

  *

 


CAPTCHA Image

[ Change the image ]


*Required

Subscribe to our fire safety blogs

Bulletins
Email Format
* indicates required

FIRE SAFETY BLOGS

  • Fire Engineering Design and Risk Assessment - Planning Sprinkler Installations - Part 29

    In LWF’s Fire Engineering and Risk Assessment blog series for Architects and others in the building design industry, we have been reviewing the proper planning of sprinkler protection as a part of the design process. In Part 28, the necessity for consultation with all relevant parties was discussed and in Part 29, we examine the building itself and how that will impact upon sprinkler installation.It is important to ascertain the nature of the proposed...

    Read more...

  • Fire Safety for Healthcare Premises - Types of Patient Dependency - Part 5

    Fire Safety for Healthcare premises is a blog series by LWF, aiming to give guidance on healthcare-based standards and best practice in fire safety. In Part 4, the use of vertical escape practices after horizontal escape had already been completed was discussed. In Part 5, we’ll look at how Firecode classifies patient dependency for the purposes of successful evacuation.Firecode separates patient dependency into three distinct classifications, as follows:Independent – An...

    Read more...

  • Facilities Management & Fire Safety - How people act in a fire situation - Part 1

    In LWF’s blog series for those who work in Facilities Management or who have a responsibility for or interest in fire safety, we have been exploring those areas of fire prevention and protection which are of prime concern to building owners and managers in a structural and practical manner. We now turn our attention to the variable element of any fire situation – people.While the majority of guidance on fire safety relates to the...

    Read more...

  • Fire Safety for Healthcare Premises - Hospital Streets & Vertical Escape - Part 4

    Fire Safety for Healthcare premises is a blog series by LWF, aiming to give guidance on healthcare-based standards and best practice in fire safety. Part 3 looked Progressive Horizontal Evacuation – the movement of patients from an area affected by fire to an adjacent fire protected area. Part 4 gives an overview of Hospital Streets, what they are designed to do and how they are used, before moving on to look at Vertical Escape.A...

    Read more...

  • Fire Engineering Design and Risk Assessment - Planning Sprinkler Installations - Part 28

    In LWF’s Fire Engineering and Fire Safety blog series for Architects and others involved in building design, we have been looking at the many options of sprinkler installation available and how they work within the constraints of the building. In Part 28, we will discuss planning for a sprinkler installation.When preparing for the installation of a sprinkler system, proper planning will ensure that the following essential criteria are met:- The sprinkler system...

    Read more...

Case Studies

The Wohl Neuroscience Institute - Fire Safety, Strategy & Engineering
Key Facts: Client: King’s Clinical Neuroscience Institute Project Manager: MACE Ltd Designers: Devereux Architects/Allies and Morrison Approximate Size: 7,400m2 Description of the Project:...

Read more..

General Bulletins

Fire - The External Risk
When we consider fire safety, our focus is normally from within, what can we do to prevent the occurrence of fire and how we can limit its damage.  Whilst this is the correct stance to take, we m...

Read more..

Technical Bulletins

Evacuation Modelling - Factor in Human Behaviour
Evacuation of buildings can be analyzed in different ways. Approved Document B (ADB) which provides guidance on meeting the requirements of the England and Wales Building Regulations with regard to fi...

Read more..