Facilities Management & Fire Safety - Calculating ASET as per BS 7974 - Part 8

Posted by LWF: 06/12/2018 12:40

In LWFs blog series for those who work in Facilities Management or who have an interest in or responsibility for fire safety, we have been looking at the concept of fire safety engineering. In part 7, we looked at BS 7974 and the framework it provides to achieve an engineered approach to fire safety in buildings and escape time. In part 8, LWF will consider escape time by breaking it down into the different components which it comprises.

The escape time is considered by sub-dividing events into components, as follows:

Detection Time

The time span between fire ignition and discovery of a fire.


Time to sound alarm 

This can be expected to take up to 10 seconds if the detection and alarm system are automatic, due to current standards. Substantially longer delays can be expected if the fire is detected by a person or people, due in part to a reticence by individuals to sound the fire alarm even if they can see fire and it has been known that people will delay sounding a fire alarm to undertake other tasks too.


Recognition time

After the fire alarm has sounded, occupants of the building sometimes continue with the task they were previously undertaking, such as eating a meal, working on something, shopping etc. Improvements upon time taken to reach recognition can be achieved with good fire safety management and training within the building.


Response time

After occupants have recognised there is a fire situation and they need to respond to the alarm signal or simply their knowledge that there is a fire, there is a further delay known as the ‘response time’ before people begin to move towards an exit. The duration of the response time can vary significantly from a few seconds to grab their phone or bag to a longer period during which they might turn off machinery, look for family members or lock a cash till, for instance.

It should be noted that the vast majority of actions undertaken during the response time are not recommended or accepted but should still be taken into account by the building owner/occupier when considering timings.

The escape time has further elements, known as ‘pre-movement time’ and ‘travel time’. Both elements will be discussed by LWF in part 9 of this series. In the meantime, if you have any queries about your own facilities or wish to discuss this blog series, please contact Peter Gyere in the first instance on 0208 668 8663.

Lawrence Webster Forrest is a fire engineering consultancy based in Surrey with over 25 years' experience, which provides a wide range of consultancy services to professionals involved in the design, development and construction and operation of buildings. 

While care has been taken to ensure that information contained in LWF's publications is true and correct at the time of publication, changes in circumstances after the time of publication may impact on the accuracy of this information.

Leave a reply

  *

  *

 


CAPTCHA Image

[ Change the image ]


*Required

Subscribe to our fire safety blogs

Bulletins
Email Format
* indicates required

FIRE SAFETY BLOGS

  • Fire Engineering Design and Risk Assessment - Firefighting & External Water Supplies - Part 27

    In LWF’s Fire Engineering blog series for Architects and others in the building design business, we have been looking at fire safety engineering. In part 26, we looked at how the choice of fire hydrant can affect the efficiency of delivery and by working out the additional time required to prime an underground hydrant when compared to a pillar hydrant with instantaneous couplings, it was established there could be as much as 2 minutes delay...

    Read more...

  • Fire Safety for Healthcare Premises - Venting of Basements - Part 61

    In LWFs blog series for healthcare professionals, the aim is to give information on best practice of fire safety in hospitals and other healthcare premises. In part 60 of this series, the placement of fire hydrants in relation to hospital buildings was discussed. In part 61, we will look at the effects of smoke on basement levels and the use of venting.A fire which starts in a basement or involves a basement level causes...

    Read more...

  • Facilities Management & Fire Safety - Insurers & Property Protection - Part 8

    In LWF’s blog series for those who work in Facilities Management or who have an interest in or responsibility for fire safety, we have been looking at the part Insurers have played in property protection over the years. In part 7, we discussed the role the FOC played in producing rules and regulations not only for building standards but also for fire protection products. In part 8, we will continue looking at the impact of...

    Read more...

  • Fire Engineering Design and Risk Assessment - Firefighting & External Water Supplies - Part 26

    In LWF’s fire engineering blog series for Architects and other interested parties in the building design business, we have been looking at firefighting. In part 25, we looked at how hydrants should be located in relation to the building perimeter and the likely position of a Fire Service pump upon attending a fire at the premises. In part 26, we continue looking at location and also the type of hydrant provided in relation to the...

    Read more...

  • Fire Safety for Healthcare Premises - Fire Mains - Part 60

    In LWFs blog series for healthcare professionals, the aim is to give information on best practice of fire safety in hospitals and other healthcare premises. In part 59 of this series, LWF discussed the requirements for healthcare buildings with a hospital street and which do not require a fire-fighting shaft. In part 60, we will look at the provision of fire mains.Fire mains must be provided in every firefighting shaft, or in some instances,...

    Read more...

Case Studies

The Wohl Neuroscience Institute - Fire Safety, Strategy & Engineering
Key Facts: Client: King’s Clinical Neuroscience Institute Project Manager: MACE Ltd Designers: Devereux Architects/Allies and Morrison Approximate Size: 7,400m2 Description of the Project:...

Read more..

General Bulletins

Fire - The External Risk
When we consider fire safety, our focus is normally from within, what can we do to prevent the occurrence of fire and how we can limit its damage.  Whilst this is the correct stance to take, we m...

Read more..

Technical Bulletins

Evacuation Modelling - Factor in Human Behaviour
Evacuation of buildings can be analyzed in different ways. Approved Document B (ADB) which provides guidance on meeting the requirements of the England and Wales Building Regulations with regard to fi...

Read more..