|
Case Study 1: Flying Flowers Ltd - Retreat Farm
Introduction |
|
Case Study 2: Fire engineering design for a ski slope ! In a pioneering introduction to performance based Fire Engineering in Madrid, Spain, LWF have developed a solution for an indoor skiing facility that throws away the old text book approach but develop... |
|
Case Study 3: Fire engineering design for retail shopping As an introduction to performance based Fire Engineering in Madrid, Spain, LWF have developed a solution for a large open retail shopping centre. The design investigates the pro and cons of smoke remo... |
|
Case Study 4: LWF helping to create a World - Class Supply Chain for Sainsburys
|
|
Case Study 5: The Natural History Museum
|
|
Case Study 6: The British Museum
|
|
Case Study 7: The Earth Galleries
|
|
Case Study 8: Mechanical Smoke Control rather than Natural
Project |
|
Case Study 9: Restoration of a 1730's Historic Building
Project |
|
Case Study 10: West Middlesex University Hospital - Fire Safety Strategy LWF were commissioned, by developers Bouygues (UK), to develop a fully cohesive fire safety strategy for a major new-build hospital incorporating the re-development of an existing adjoining hospital w... |
|
|