Lawrence Webster Forrest (LWF), Fire Engineering and Fire Risk Management Consultants
Lawrence Webster Forrest (LWF), Fire Engineering and Fire Risk Management Consultants



Navigation

Client login
Forgotten password
Follow us on Twitter Follow us on Facebook Subscribe to our blog

Lawrence Webster Forrest
Legion House
Lower Road
Kenley
Surrey
CR8 5NH

Tel: +44 (0)20 8668 8663 Fax: +44 (0)20 8668 8583
E-mail: fire@lwf.co.uk

Case Study: The British Museum - Fire safety, fire engineering techniques, evacuation

Key Facts:

Client: The British Museum
Architect: Rogers Stirk Harbour + Partners
Approximate Size: 85,000m2

Description of the Project:

The British Museum is a museum of human history
and culture. The building is located at the
Bloomsbury site in London. Its collections are
amongst the most comprehensive in the world.
The building comprises of galleries, exhibition
areas, learning facilities, information
facilities and shops, catering facilities,
information desks, store rooms,
workshops, offices, plant rooms and
changing rooms.  

LWF Involvement:

LWF were commissioned by The British Museum
to prepare and review the fire strategy for the
public areas of the museum. The key services
provided include:

• Review the potential fire risk and fire load criteria
for all public spaces within the Museum;

• Provide analysis of Computational Fluid
Dynamics (CDF) simulation to prepare a
complete fire hazard profile for life safety;

• Generate the computer model Simulation of
Transient Evacuation for Pedestrian Smoke
Movement (STEPS) to determine evacuation
requirements for the building;

• Establish the Museum’s intent for finalised fire
alarm design ‘cause and effect’;

• Prepare a detailed Fire Strategy and revise Fire
Plan Strategy drawings;

• Liaison with the fire authority to gain conceptual
approval.


 
  
 




For further information regarding this project or the services that LWF provide please contact:
Peter Gyere – Marketing Manager
Lawrence Webster Forrest
Legion House
Lower Road
Kenley
Surrey CR8 5NH

TEL: +44 (0)20 8668 8663
FAX: +44 (0)20 8668 8583

Email: p.gyer@lwf.co.u 



Link:

Subscribe to our fire safety blogs

Bulletins
Email Format
* indicates required

FIRE SAFETY BLOGS

  • Fire Engineering Design and Risk Assessment - Firefighting & The Fire Service - Part 18

    In LWF's Fire Engineering blog series for Architects and others involved in building design, we have been looking at firefighting. In part 17, we began to look at how firefighting is undertaken by the Fire Service and their objectives and modes of operation when arriving at a fire. In part 19, tactical firefighting is discussed.While the general objectives of tactical firefighting were given in the last blog, there are various methods used by firefighters...

    Read more...

  • Fire Safety for Healthcare Premises - Open-sided Car Parks - Part 52

    In LWFs blog series for healthcare professionals, the aim is to give information on best practice of fire safety in hospitals and other healthcare premises. In part 51 of this series, we were looking at the potential for fire spread from one area of a building to another through external surfaces, before moving on to begin to look at the necessary arrangements for car parks. In part 52, we continue on that theme by considering...

    Read more...

  • Facilities Management & Fire Safety - Calculating RSET - Part 9

    In LWFs blog series for those who work in Facilities Management or who have an interest in or responsibility for fire safety we have been looking at fire safety engineering. In part 8, we looked at how ASET (Available Safe Egress Time) is calculated and how this should always be more than the RSET (Required Safe Egress Time). While ASET involves a series of calculations relating to fire growth and the building itself, RSET, also...

    Read more...

  • Fire Engineering Design and Risk Assessment - Firefighting & The Fire Service - Part 17

    In LWF’s fire engineering blog series for Architects and others in the business of building design, we have been looking at firefighting. In part 16, we discussed first-aid firefighting by the occupancy and the use of hose reels to do so. In part 17, we will begin to look at firefighting from the point of view of the Fire Services.The particular objectives of the Fire Service in a given situation will be decided upon...

    Read more...

  • Fire Safety for Healthcare Premises - External Fire Spread - Part 51

    In LWF’s blog series for healthcare professionals, the aim is to give information on best practice of fire safety in hospitals and other healthcare premises. In part 50 of this series, we discussed the potential for external fire spread including calculating unprotected areas and consideration of the surfaces of external walls and roofs. In part 51, we continue looking at external fire spread, starting with junctions of different elements.At the junction of wall and...

    Read more...

Case Studies

The Wohl Neuroscience Institute - Fire Safety, Strategy & Engineering
Key Facts: Client: King’s Clinical Neuroscience Institute Project Manager: MACE Ltd Designers: Devereux Architects/Allies and Morrison Approximate Size: 7,400m2 Description of the Project:...

Read more..

General Bulletins

Fire - The External Risk
When we consider fire safety, our focus is normally from within, what can we do to prevent the occurrence of fire and how we can limit its damage.  Whilst this is the correct stance to take, we m...

Read more..

Technical Bulletins

Evacuation Modelling - Factor in Human Behaviour
Evacuation of buildings can be analyzed in different ways. Approved Document B (ADB) which provides guidance on meeting the requirements of the England and Wales Building Regulations with regard to fi...

Read more..

Site map | Web development London