Lawrence Webster Forrest (LWF), Fire Engineering and Fire Risk Management Consultants
Lawrence Webster Forrest (LWF), Fire Engineering and Fire Risk Management Consultants



Navigation

Client login
Forgotten password
Follow us on Twitter Follow us on Facebook Subscribe to our blog

Lawrence Webster Forrest
Legion House
Lower Road
Kenley
Surrey
CR8 5NH

Tel: +44 (0)20 8668 8663 Fax: +44 (0)20 8668 8583
E-mail: fire@lwf.co.uk

Case Study: Qatar Education City Convention Centre - Fire Strategy, Fire Safety

Key Facts:

Client: Qatar Petroleumrn
Contractor: Baytur Construction and Contracting Co.
Designer: RSA Design Group
Approximate Size: 79,000m3

Description of the Project:

The Convention Centre is provided as part of the Qatar Foundation EducationCity, located on the outskirts of Doha, the capital of Qatar.  To be completed in 2010 the Convention Centre will become one of the largest in the Middle East. The building will feature several performance halls including a 2,500 seat theatrical auditorium, an exhibition hall and banquet facilities for up to 7,000 people. Other ancillary accommodation includes kitchen, prayer rooms, IT facilities, lounges, office spaces, support areas, car parks and utility spaces.

LWF Involvement:

LWF are appointed to provide fire safety and fire engineeringservices to the project including the production of the Fire Strategyfor the proposed new building. Key services provided include:

• Provide analysis using Computational Fluid Dynamics (CFD) simulation to justify non-compliance issues relating to themeans of escape provisions from the Auditorium;

• Prepare a qualitative report to justify the ineffectiveness ofsprinkler systems in high ceiling clearance concourse areas;

• Prepare an assessment report to justify the structural fireresistance of building elements;

• Review the active fire protection systems detailed design e.g.suppression systems, smoke control etc;

• Coordinate with the client design team;

• Liaise with Qatar Civil Defence Department for fire safety approval of the scheme.

 

 





For further information regarding this project or the services that LWF provide please contact:
Peter Gyere – Marketing Manager
Lawrence Webster Forrest
Legion House
Lower Road
Kenley
Surrey CR8 5NH

TEL: +44 (0)20 8668 8663
FAX: +44 (0)20 8668 8583

Email: p.gyer@lwf.co.u 


Subscribe to our fire safety blogs

Bulletins
Email Format
* indicates required

FIRE SAFETY BLOGS

  • Fire Engineering Design and Risk Assessment - Firefighting & External Water Supplies - Part 27

    In LWF’s Fire Engineering blog series for Architects and others in the building design business, we have been looking at fire safety engineering. In part 26, we looked at how the choice of fire hydrant can affect the efficiency of delivery and by working out the additional time required to prime an underground hydrant when compared to a pillar hydrant with instantaneous couplings, it was established there could be as much as 2 minutes delay...

    Read more...

  • Fire Safety for Healthcare Premises - Venting of Basements - Part 61

    In LWFs blog series for healthcare professionals, the aim is to give information on best practice of fire safety in hospitals and other healthcare premises. In part 60 of this series, the placement of fire hydrants in relation to hospital buildings was discussed. In part 61, we will look at the effects of smoke on basement levels and the use of venting.A fire which starts in a basement or involves a basement level causes...

    Read more...

  • Facilities Management & Fire Safety - Insurers & Property Protection - Part 8

    In LWF’s blog series for those who work in Facilities Management or who have an interest in or responsibility for fire safety, we have been looking at the part Insurers have played in property protection over the years. In part 7, we discussed the role the FOC played in producing rules and regulations not only for building standards but also for fire protection products. In part 8, we will continue looking at the impact of...

    Read more...

  • Fire Engineering Design and Risk Assessment - Firefighting & External Water Supplies - Part 26

    In LWF’s fire engineering blog series for Architects and other interested parties in the building design business, we have been looking at firefighting. In part 25, we looked at how hydrants should be located in relation to the building perimeter and the likely position of a Fire Service pump upon attending a fire at the premises. In part 26, we continue looking at location and also the type of hydrant provided in relation to the...

    Read more...

  • Fire Safety for Healthcare Premises - Fire Mains - Part 60

    In LWFs blog series for healthcare professionals, the aim is to give information on best practice of fire safety in hospitals and other healthcare premises. In part 59 of this series, LWF discussed the requirements for healthcare buildings with a hospital street and which do not require a fire-fighting shaft. In part 60, we will look at the provision of fire mains.Fire mains must be provided in every firefighting shaft, or in some instances,...

    Read more...

Case Studies

The Wohl Neuroscience Institute - Fire Safety, Strategy & Engineering
Key Facts: Client: King’s Clinical Neuroscience Institute Project Manager: MACE Ltd Designers: Devereux Architects/Allies and Morrison Approximate Size: 7,400m2 Description of the Project:...

Read more..

General Bulletins

Fire - The External Risk
When we consider fire safety, our focus is normally from within, what can we do to prevent the occurrence of fire and how we can limit its damage.  Whilst this is the correct stance to take, we m...

Read more..

Technical Bulletins

Evacuation Modelling - Factor in Human Behaviour
Evacuation of buildings can be analyzed in different ways. Approved Document B (ADB) which provides guidance on meeting the requirements of the England and Wales Building Regulations with regard to fi...

Read more..

Site map | Web development London