Case Study: Middlesex University Hendon - Hatchcroft - Fire Engineering Design strategy

Key Facts:

Client: Middlesex University
Architect / Lead Consultant: BPR Architects
Approximate Size: 5600m2

Description of the Project:

The Hatchcroft building is part of the Middlesex
University Hendon Development and is a new
stand alone teaching and research facility
consisting of a variety of laboratories
and teaching areas. The building houses
the University’s School of Health and
Social Sciences and School of Engineering
and Information Sciences and consists of
three occupied floors Ground to 2nd with a
flat roof terrace area also accessible to
occupants.

LWF Involvement:

LWF were appointed to provide fire safety
and fire engineering services to the proposed
construction of the Hatchcroft building for the
University of Middlesex.

The key services provided include:

• Review design proposals and provide initial
feedback on possible non-compliance issues;

• Coordinate with the client and design team to
provide fire engineering input where required by
the design;

• Develop the fire strategy report for submission
to client and approving authority;

• Prepare fire strategy drawings;

• Liaise with approval authority for Building
Regulations Part B approval of the project.

 

 







For further information regarding this project or the services that LWF provide please contact:

Peter Gyere – Marketing Manager
Lawrence Webster Forrest
Legion House
Lower Road
Kenley
Surrey CR8 5NH

TEL: +44 (0)20 8668 8663
FAX: +44 (0)20 8668 8583

Email: p.gyere@lwf.co.uk



Link:

Subscribe to our fire safety blogs

Bulletins
Email Format
* indicates required

FIRE SAFETY BLOGS

  • Fire Engineering Design and Risk Assessment - Firefighting & Rising Water Mains - Part 36

    In LWF’s fire engineering blog series for Architects and others in the building design business, we have been talking about firefighting and rising water mains in buildings. In part 35, we began to discuss wet rising water mains and in part 36 we will continue looking at that subject before considering horizontal mains, also known as internal hydrants, which are seen more commonly in buildings with large floor area.It was established in part 35...

    Read more...

  • Fire Safety for Healthcare Premises - Fire Safety Audits - Part 70

    In LWF’s blog series for healthcare professionals, the aim is to give information on best practice of fire safety in hospitals and other healthcare premises. In part 69, we discussed the management of staffing levels and in addition to the number of staff available, it was important that each and every staff member had adequate training in fire and evacuation issues. In part 70, we will discuss fire safety audits and what arrangements should be...

    Read more...

  • Facilities Management & Fire Safety - Business Continuity Insurance - Part 17

    In LWF’s blog series for those who work in Facilities Management or who have an interest in or responsibility for fire safety, we have been looking at how businesses are protected against interruption from fire. In part 16, we began an overview of the history of consequential loss insurance, which only came into being around 1900, long after life and property protection insurance.  In part 17, we continue from the 1960s.Although the increase in...

    Read more...

  • Fire Engineering Design and Risk Assessment - Firefighting & Rising Water Mains - Part 35

    In LWF’s Fire Engineering blog series for Architects and others in the building design business, we have been looking at those provisions which can be made to assist firefighting in case of a fire. In part 34, we commenced looking at wet rising mains and noted that while they can be permanently connected to water mains, it is more common to see the systems connected to a water tank with a pump or gravity feed,...

    Read more...

  • Fire Safety for Healthcare Premises - Fire Safety & Staffing Levels - Part 69

    In LWF’s blog series for healthcare professionals, the aim is to give information on best practice of fire safety in hospitals and other healthcare premises. In part 68, LWF discussed staffing levels in terms of fire safety and the importance of the staff in attendance having sufficient fire safety training. In part 69, we will continue looking at staffing levels and fire safety concerns.The management of any healthcare venue must consider and agree what...

    Read more...

Case Studies

Brentwood Town Hall Redevelopment
The redevelopment of Brentwood Town Hall included renovating the existing five storey property to provide police and council offices, a community hub and lettable office space across the basement, gro...

Read more..

General Bulletins

Fire - The External Risk
When we consider fire safety, our focus is normally from within, what can we do to prevent the occurrence of fire and how we can limit its damage.  Whilst this is the correct stance to take, we m...

Read more..

Technical Bulletins

Evacuation Modelling - Factor in Human Behaviour
Evacuation of buildings can be analyzed in different ways. Approved Document B (ADB) which provides guidance on meeting the requirements of the England and Wales Building Regulations with regard to fi...

Read more..

Site map | Web development Croydon